Control Technologies Logo
Projects
Projects Examples
   
 
   
 
   
   
  DCS Boiler Control System Upgrade for Caroni (1975) Ltd.

  • Control System – Freelance 2000, 19” Rackmount Process Station
  • I/O Point Count – Over 30AI, AO
  • Filed Instruments Supplied – ABB Pressure Transmitters, Instrument Cables,
  • Two (2) Workstations, Hoffmann Enclosure
  • Redundancy – Redundant Controllers Implemented.
  • Capacity - 8Mb per CPU Module
  • Engineer / Operator Training done locally by CT staff
  • Control design developed by CT Staff
  • Customer/End User – Caroni (1975) Ltd. St. Madeline.

 

 
Related Links
Technical Support
Training Registration
Downloads
home    products    services    projects    company information    agency    support    resources    privacy policy   
© 2009 - 2010 Control Technologies Limited. All Rights Reserved.